Layout and fixtures
Coordinate clearances, door swing, shower, WC, basin, storage, mirrors, accessories, accessibility review, and housekeeping access.
- Fixture schedule
- Dimensioned layout
- Cleaning and storage needs
WET-AREA COORDINATION
A bathroom is a coordinated system of structure, falls, waterproofing, finishes, ventilation, plumbing, hot water, electrical safety, service access, testing, and site connections.

BUYER PRIORITIES
Fixture selection alone is not enough. The quotation should identify factory work, site connections, testing, protection, commissioning, maintenance, and exclusions.
Coordinate clearances, door swing, shower, WC, basin, storage, mirrors, accessories, accessibility review, and housekeeping access.
Define substrate, falls, drains, membranes, junctions, penetrations, finishes, extraction, make-up air, and inspection records.
Coordinate water pressure, hot water, valves, traps, wastewater, frost protection, electrical zones, access panels, transport protection, and site connection.
PROJECT ENQUIRY
Share the destination, intended use, quantity, preferred configuration, target date, and any drawings. CabinWild will use the information to prepare the next project discussion.
WORKING METHOD
A model name is only a starting point. Review the assembly, supplied items, site work, performance inputs, and evidence together.
State intended users, destination, occupancy, operating pattern, room functions, quantity, and target programme.
Check plans, sections, furniture, openings, services, interfaces, component sizes, and installation access.
Approve materials, build-ups, finishes, options, samples, supplied items, exclusions, and maintenance expectations.
Coordinate packing, freight, unloading, storage, foundations, labour, lifting, weather, and inspections.
Close defects and collect current drawings, manuals, test records, spares, warranties, and maintenance information.
BUYER NOTE
Local water quality, pressure, drainage, wastewater treatment, frost risk, electrical rules, commissioning, and authority requirements remain destination-specific. Confirm drawings, inclusions, material records, inspection criteria, packing details, and the responsibility split in the project quotation.
BUYER QUESTIONS
Clear starting answers for commercial buyers. Final scope and compliance remain project-specific.
A high level of factory completion may be possible depending on the supply format, transport, protection, local connections, inspection, and destination requirements. Confirm the exact tested and untested scope.
The contract responsibility matrix should name the party for external utilities, connection, testing, permits, commissioning, defects, and handover. Do not leave it implied.
Tell us about your location, cabin style, and project requirements.
info@CabinWild.com