Factory completion
Compare structure, envelope, finishes, wet areas, services, testing, furniture, protective work, and evidence completed before dispatch.
- Factory-versus-site matrix
- Tested scope
- Protection requirements
SUPPLY FORMAT COMPARISON
The best format depends on route and site access, factory completion, damage exposure, local labour, lifting, weather, utilities, programme, inspection, and total installed cost.

DECISION FRAMEWORK
A format that reduces factory work can increase site time, while a highly completed module can increase transport, lifting, route, and damage sensitivity.
Compare structure, envelope, finishes, wet areas, services, testing, furniture, protective work, and evidence completed before dispatch.
Review dimensions, weights, container use, oversize transport, routes, cranes, unloading, storage, handling, and delivery sequencing.
Compare foundation tolerance, labour, supervision, weather, temporary works, service connections, tests, defects, and completion programme.
PROJECT ENQUIRY
Share the destination, intended use, quantity, preferred configuration, target date, and any drawings. CabinWild will use the information to prepare the next project discussion.
WORKING METHOD
Use one project brief, one responsibility matrix, and one installed-scope framework so labels do not hide different assumptions.
Keep destination, occupancy, layout, performance, finish, quantity, programme, and operating requirements constant.
Record factory work, supplied components, freight, site work, services, testing, documents, and exclusions.
Review drawings, samples, technical basis, quality controls, packing, references where verifiable, and support.
Include access, route, labour, lifting, weather, storage, damage, approvals, commissioning, and contingency.
Record the chosen basis, rejected assumptions, remaining risks, responsibilities, and approval authority.
BUYER NOTE
Definitions vary between suppliers. Require each bidder to mark the same responsibility matrix and identify what arrives complete, what needs assembly, and what remains outside the offer. Confirm drawings, inclusions, material records, inspection criteria, packing details, and the responsibility split in the project quotation.
BUYER QUESTIONS
Clear starting answers for commercial buyers. Final scope and compliance remain project-specific.
Not necessarily. Shipping depends on packing efficiency, component protection, container utilisation, route, quantity, handling, damage risk, and the cost of site assembly and storage.
It can reduce some site work, but route access, crane planning, foundation accuracy, delivery sequence, utility connections, weather, inspections, and commissioning still affect the programme.
Tell us about your location, cabin style, and project requirements.