Module definition
Confirm which structure, envelope, finishes, furniture, wet areas, services, testing, and protective measures are complete before dispatch.
- Factory-complete scope
- Site-complete scope
- Interface drawings
MODULE-BASED SUPPLY
Modular supply can move more work into a controlled production environment, but transport limits, lifting, module interfaces, site access, foundations, and final commissioning need early coordination.

BUYER PRIORITIES
Module dimensions, weights, protection, lifting points, routes, foundations, tolerances, joint closures, utilities, decks, and weather sealing belong in one delivery plan.
Confirm which structure, envelope, finishes, furniture, wet areas, services, testing, and protective measures are complete before dispatch.
Check route, permits, escorts, turning, bridge and gate limits, crane selection, lifting points, temporary protection, and delivery weather.
Coordinate foundations, levelling, module joints, roof or façade closures, utilities, testing, defects, cleaning, and handover records.
PROJECT ENQUIRY
Share the destination, intended use, quantity, preferred configuration, target date, and any drawings. CabinWild will use the information to prepare the next project discussion.
WORKING METHOD
A model name is only a starting point. Review the assembly, supplied items, site work, performance inputs, and evidence together.
State intended users, destination, occupancy, operating pattern, room functions, quantity, and target programme.
Check plans, sections, furniture, openings, services, interfaces, component sizes, and installation access.
Approve materials, build-ups, finishes, options, samples, supplied items, exclusions, and maintenance expectations.
Coordinate packing, freight, unloading, storage, foundations, labour, lifting, weather, and inspections.
Close defects and collect current drawings, manuals, test records, spares, warranties, and maintenance information.
BUYER NOTE
The preferred completion level depends on route limits, damage risk, local labour, site access, programme, inspection, customs, lifting, and the feasibility of protecting finished work. Confirm drawings, inclusions, material records, inspection criteria, packing details, and the responsibility split in the project quotation.
BUYER QUESTIONS
Clear starting answers for commercial buyers. Final scope and compliance remain project-specific.
Some projects may support a high level of factory completion, but module size, route, lifting, protection, customs, destination rules, and site connections determine the practical scope.
Structural, weather, fire, acoustic, finish, and service interfaces require project-specific details, tolerances, sequence, inspections, and local professional review.